Back to the Basement

Posted on November 19, 2008 by Andrew MacVie

My office and the bathroom area is done, now on to the rest of the basement.

This is the last corner of the basement to be covered. It is warmer already. Now on to the walls.

This is a view of the first walls to go up. The black pipe coming out of the floor is for the toilet and if you look on the floor between the studs you can see the drain for the sinks. One will be in the bathroom and one will be on the opposite side of the wall. That is were I will put my paint booth.

This is the paint booth area. The pit in the floor is were all the waste water goes before it is pumped into the sewer line. The pump will be installed later.

Login

Enter your username and password below to login to your account.

Login
×